News
The contract covers the 'provision of directional drilling, drilling fluids, cementing, wireline logging and tubular running services'. The award also 'incorporates advanced engineering and ...
The award covers the provision of directional drilling, drilling fluids, cementing, wireline logging, and tubular running services. It also includes advanced engineering and technical support to ...
When TD is reached, wireline logging will then be commenced, followed by flow and pressure readings at the wellhead. This data will be used to estimate the production potential of the well based ...
No water contact was observed. In a statement, Namcor noted that wireline logging operations were conducted extensively, enabling the acquisition of sidewall cores and hydrocarbon samples.
When TD is reached, wireline logging will then be commenced, followed by flow and pressure readings at the wellhead. This data will be used to estimate the production potential of the well based on ...
When TD is reached, wireline logging will then be commenced, followed by flow and pressure readings at the wellhead. This data will be used to estimate the production potential of the well based ...
Hosted on MSN17d
ADNOC Drilling secures $1.63bn drilling services contractADNOC Drilling has been awarded a $1.63bn (Dh5.99bn) contract by ADNOC Offshore to provide integrated drilling services (IDS). The five-year contract encompasses a suite of services including ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results