News
The National Capital Region Transport Corporation (NCRTC) has completed a crucial trial run of the Namo Bharat trains on the ...
Gurgaon: Uncertainty over the exact location of the proposed rapid rail (RRTS) station at Cyber City has derailed integrated ...
The National Capital Region Transport Corporation (NCRTC) on Sunday successfully conducted a full-length timetable trial of ...
NCRTC achieved a milestone with successful trial runs of Namo Bharat trains across the entire 82 km Delhi-Meerut corridor, ...
During the trial, the high-speed train ran from Sarai Kale Khan in Delhi to Modipuram in Meerut, stopping at all stations and ...
The Namo Bharat corridor trains halted at every station between Delhi's Sarai Kale Khan and Modipuram in Meerut and ...
The NCRTC completed a successful trial run for Namo Bharat trains on the Delhi-Ghaziabad-Meerut corridor, covering the ...
Trial runs and final finishing works are ongoing on the remaining stretches -- approximately 4.5 km between Sarai Kale Khan ...
The trains stopped at every station between Sarai Kale Khan and Modipuram and covered the distance in less than an hour, as ...
The National Capital Region Transport Corporation (NCRTC) has completed a full-length timetable trial run of the Namo Bharat trains on the 82-kilometre Delhi-Ghaziabad-Meerut corridor. They covered ...
There is a good news for commuters as the National Capital Region Transport Corporation (NCRTC) has successfully completed a ...
The National Capital Region Transport Corporation (NCRTC) has announced that it has successfully completed a scheduled trial ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results